Approach
Power first.
Then test the corridor.
A developable site is the scarce asset.
Power comes first. Then the corridor has to support fibre, land, water, approvals, community and a delivery path before an owner can take an investment decision.
Power
First gate
A parcel without a credible electrical path is not a data centre site. Connection, capacity, contestability and programme sit ahead of the land price.
Corridor
Where the infrastructure can line up
Power identifies where to look. The corridor test asks whether transmission, fibre, water, land, planning and delivery can plausibly line up before a parcel becomes the focus.
Fibre
Resilience + connectivity
Route diversity, latency to the metros that matter, and lead time. A carrier in the street is not the same as a resilient design.
Land / site
Control + suitability
Title, tenure, access, ground conditions and hazards, and whether the land can be held through to an investment decision. Land is necessary. It is not the first gate.
Water / cooling
Design basis
Source, discharge, climate and the cooling strategy have to be chosen before a cost plan means anything.
Approvals
Path to consent
Zoning starts the question. The test is whether consent can be obtained on a programme the owner can price.
Community
Licence to proceed
Neighbours, councils, Traditional Owners and local Aboriginal land councils, from the start, and the public interest in power and water. This sits on the programme, not beside it.
Delivery
Cost + programme
Scope, procurement route, long-lead equipment, and the risks that have to be retired, allocated or priced before FID.
FID
Capital decision
The owner’s decision. The work to that point is to put a defined project in front of it. EPC and construction follow commitment.
Position
On the owner’s side.
Bondaian coordinates the interfaces. It does not replace the specialists the project still needs, and it does not cross the table.
- A property agency
- A land broker
- A planning consultancy
- An engineering consultancy
- A lobbying firm
- An EPC contractor
- A capital-raising adviser
To FID
- 01
Originate
Identify the corridor. Test power, fibre and utilities. See whether a site can be controlled, and whether it is worth taking further.
- 02
Develop
Run grid connection, planning and approvals, design, government, community, cost and programme as one development.
- 03
Ready for FID
Scope defined. Approvals in hand or far enough along. Utility path understood. Cost and programme developed. Risks retired, allocated or priced.
- 04
EPC / construction
The owner decides whether to commit capital. Construction delivery takes over.